Skip to main content
Implementation Guide

Attendance and Weighing Rollout Checklist for Tea Gardens

A section-by-section sequence for bringing face attendance and smart weighing live without stopping garden work.

By Sarbani Associates Updated September 2026 7 min read

1. Site visit and workflow review

Start on the ground, not on a call. Walk the sections, watch one full muster and one weighment, and record the estate's actual practice:

  • Which sections run muster where, and at what time.
  • Weighment points, scale condition, and bag tare practice.
  • Current task norms, deduction slabs, and fine leaf rules.
  • Office workflow: who reviews attendance, who prepares wages.
  • Connectivity at muster points, weighing sheds, and the office.

The rollout plan comes from this list. Skipping the visit is the most common cause of a rollout that fights the garden's routine.

2. Master data and device setup

Before the first device reaches a line, load and check the records the field depends on:

  1. Workers with their permanent estate IDs, sections, and roles.
  2. Sections, work codes, and task definitions.
  3. Rules: tare weights, rainfall slabs, fine leaf settings, task norms.
  4. Device users and permissions for each supervisor.
  5. Bluetooth scales paired and their tare configuration checked.

Check this data against the muster book section by section. Every name fixed here is a dispute that never happens at payroll.

3. Enrollment and training

Capture enrollment photos section by section, following the capture practice in the enrollment guide. Then train the people who will run the system:

  • Supervisors: muster, punch work, weighing, session handling, and the manual fallback.
  • Weighing staff: scale pairing, tare, deductions, and what to do when Bluetooth drops.
  • Office staff: review views, corrections, finalization, and exports.

Keep the training in simple language and on the actual devices. A printed manual is no substitute for the first supervised muster.

4. The parallel run

Run face attendance beside the paper register for about a week. Supervisors get comfortable, and the office can compare both records daily. Expect a short list of fixes in week one: a few re-enrollments, a device placement change, a tare correction. That is the parallel run doing its job.

5. Go-live and the first month

Switch a section off paper when its muster, weighing, and office review have run clean through the parallel run. During the first month:

  • Check sync status at end of day from every device.
  • Review the office views daily until corrections become rare.
  • Handle re-enrollments as they surface, not in a batch at month end.
  • Keep Sarbani Associates support contact close for the first pay cycle.

Section by section, the paper register retires itself. No big-bang date, no line stopped for a software change.

Common questions

Short answers to what estate owners and managers ask most

General

Most estates can go live section by section within a few weeks. The pace depends on how many sections you start with and how quickly enrollment and training finish. Sarbani Associates gives you a dated schedule after the site visit.

Yes, and we recommend it for the first week. The parallel run lets supervisors compare both systems daily and switch only when the office trusts the new records.

Field sections run the face attendance app on Android tablets with Bluetooth hanging scales for weighing. The office runs the GardenSuite office system on standard Windows computers. Exact requirements are confirmed at the site visit.

Sarbani Associates trains supervisors, weighing staff, and office clerks on site, in simple language, and stays available during the first weeks of live use.

The checklist is per section, so one late section does not hold the estate. Bring sections live in an order that matches their readiness rather than forcing one big switchover date.

Can't find what you're looking for? contact our team

Roll out with support on the ground

Book a free demo. Sarbani Associates runs the rollout beside your staff, from first site visit to go-live support. Demo, on-site setup, and staff training are free.

Built and supported by Sarbani Associates, Bagdogra, Siliguri. Many estates keep software details private. We respect confidentiality and share region-level experience.